0



Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.
consectetur adipiscing elit.
Sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. consectetur adipiscing elit. Sed
do eiusmod tempor incididunt ut labore et dolore magna aliqua. consectetur adipiscing elit. Sed do
eiusmod tempor incididunt ut labore et dolore magna aliqua.




The nav element defines a set of navigation links:



1. Feed Rate, gpd = (Chemical Feed, lbs/day)(100%)/(Chemical, lbs/gal)(Purity of Chemical,%)


2. Feeder Setting, gpd = (Flow, MGD)(Dosage, mg/L)(8.34 lbs/gal/(Chemical, lbs/gal)


3. Water HP = (Flow, gpm)(TDH)/(3960)


4. Motor HP = (Flow, gpm)(Height, ft)/(3960)(Ep)(Em)


5. Brake HP = (Flow, gpm)(Height, ft)/(3960)(Ep)


6. Mixture Strength, % = (A, gal)(A%) +(B, gal)(B%)/(A,gal+B,gal)


7. H2O, gal = (Chemical, gal)(Chemical %) - (Chemical, gal)(Desired %)


8. Dose, mg/L = (Chemical, lbs)/(Flow, Mlbs)


9. Velocity, ft/min = (Distance, ft)/(Time, min)


10. Chemical Feed, lbs = (Dose, mg/L)(Flow, Mlbs)


11. Detension Time, hr = (Volume, gal)(24 hr/day)/(Flow, gpd)


12. Surface Loading, gpd/ft2 =(Flow,gpd)/(Surface Area, ft2)